Project Highlights:
- Construction of the 210,000m2 of Concrete Apron and Laydown Area
- Placement of 330,000te of Granulars
- Placement of 51,000m3 of Cement Stabilized Base
- Placement of 110,000m3 of Portland Cement Concrete Pavement
- 4065m Subgrade Drainage 200mm Ø, Perforated PVC pipe
- 1300m of Sewer Installation
- 9449te of Asphalt Placement
- Electrical Installations